Exterior Renovations

Siding, soffit, fascia & eavestrough — measured, not guessed.

Build a real preliminary budget the way we actually price it: each wall, gable and roofline measured as its own system. Takes a couple of minutes.

Northumberland, Quinte, Kawartha & Surrounding Areas · Pre-HST preliminary ranges
Trim & Drainage
Siding
Full Exterior
S1 Siding product
Vinyl horizontal
Vinyl board & batten
LP SmartSide horizontal
LP SmartSide board & batten
S2 How to measure
Build by wall
I know my sq ft

Add each wall and gable. We total the area, subtract openings, then add 10% waste.

Windows & doors
Use typical allowance (−15%)
Enter my own openings

We'll deduct a typical 15% of wall area for windows and doors. Choose "Enter my own" to be exact.

Does that number already include waste?
No, add 10%
Yes, it's final
S3 Prep & existing wall

Tap to add. Blue = selected and adding cost. (Brick/stone strapping is set per wall above.)

Remove vinyl/aluminum
Remove old wood
Multiple existing layers
Housewrap
Window/door capping

Capping is a separate scope confirmed at a site visit — tell us roughly how many.

Bay / custom / unusual trim (review)

Multiple layers, brick strapping, capping and any rotten sheathing are confirmed at a site visit.

R1 Which trades?
Soffit
Fascia
Eavestrough
Downpipes
Gutter guard
6" eavestrough upgrade
R2 Roof sections

Add each roof section (house, garage, addition, porch). We measure eaves, rakes and gutters per section.

Hip / valleys / dormers / not sure (review)
R3 Downpipes
Underground drainage tie-in (review)
Removal & access
Remove old soffit/fascia/eaves
Access
Easy
Moderate
Tight / hand carry
Lift / scaffold / 3-storey (review)